Description:

The model is based on the existing terrain, which is adjusted so that the model can be used to show the future situation.

Where designed models replace the surface in the existing terrain, this area is removed in the model for the adapted terrain. The designed models could be e.g. corridors, structures and basins.

 

Usage:

The model is primarily used for visualization and communication between the different parties in the project.

 

​​

LOD 100

LOD 200

LOD 300

LOD 325

LOD 400

LOG 100

LOG 200

LOG 300

LOG 325

LOG 400

 

Not relevant

 

 

 

 

Not relevant

 

 

 ​ 

The model is based on the existing terrain, which is adjusted so that the model can be used to show the future situation. 

Where designed models replace the surface in the existing terrain, this area is removed in the model for the adapted terrain. The designed models could be e.g. corridors, structures and basins.

 

 

Pending

 

 

 

 

Pending

LOI 100

LOI 200

LOI 300

LOI 325

LOI 400

 

Pending

 

DDA Layers

Geometrical parameters

 

Pending

 

Pending

 

Pending

​​​

Naming of layers:

The providing of data shall take place in accordance with the names of layers mentioned below:​

 

 Clipped terrain

 
  
  
  
Udklippet terrænEksisterende terræn, hvor områder med projekterede 3D modeller er klippet udTX_G_DTM_Teran
​​